CITA ASASI SDN BHD | 2018.12 Construction of the left and right diversion tunnels of the Baleh Power Station in Sarawak
17274
portfolio_page-template-default,single,single-portfolio_page,postid-17274,qode-quick-links-1.0,ajax_fade,page_not_loaded,,qode-theme-ver-11.1,qode-theme-bridge,wpb-js-composer js-comp-ver-5.1.1,vc_responsive
 

2018.12 Construction of the left and right diversion tunnels of the Baleh Power Station in Sarawak

About This Project

2018.12 Construction of the left and right diversion tunnels of the Baleh Power Station in Sarawak